‹ Back to the blog

Buying & selling · · 21 min read

Buying a new-build home in the Madrid region in 2026: VAT, AJD stamp duty, guaranteed off-plan payments, delivery delays, specifications, housing cooperatives and warranties

Buying a new home from a developer is not like buying a resale flat: you pay VAT instead of ITP (property transfer tax), you hand over money while the building is going up and you depend on it being finished on time. As of 31 October 2026, we explain which taxes you pay in the Madrid region, where the cut in AJD (stamp duty on the deed) to 0.4% for under-40s stands, how your advance payments must be guaranteed, what you can claim if handover is late and what the 1-, 3- and 10-year warranties cover.

10%VAT on a new home sold by the developer, including up to two parking spaces and annexes sold with it (Spanish Tax Agency, 2026 VAT rates)
4%VAT on special-regime or publicly promoted officially protected homes (VPO) sold by their developer (Spanish Tax Agency, 2026 VAT rates)
0.75%AJD on the purchase deed in Madrid if the home is worth more than €180,000 (Community of Madrid, updated 23 April 2026)
0.4%Proposed AJD for under-40s buying a new home, in the 2027 draft budget registered on 30 October 2026; not yet in force (Community of Madrid, October 2026)
30 daysTime the insurer has to pay you after you claim back your advance payments (Building Act, first additional provision, BOE)
1, 3 and 10 yearsLiability periods for finishing, habitability and structural defects (Building Act, article 17, BOE)

A new-build home has clear advantages: nobody has lived in it, it meets current technical standards and, for years, serious defects are covered by law. In exchange, the purchase works differently. You almost always sign a private contract with the developer long before the home exists, pay instalments during construction, and only sign the deed before a notary at the end, once the building is finished and its paperwork is in order. Two or three years can pass between the two.

With the rules in hand, we go through what you should know if you buy off-plan or a just-finished home in the Madrid region, from taxes to notary and land registry fees.

Before you start. This article is for information only and is up to date as of 31 October 2026. It is no substitute for advice from a lawyer or tax adviser on your specific case. The AJD cut for under-40s is part of a bill awaiting debate in the Madrid Assembly: it may change and will only apply once the law is published and in force.

The essentials in one minute

  • If you buy from the developer, you pay VAT (10%, or 4% for certain officially protected homes) and AJD on the deed: in Madrid, 0.75% if the home is worth more than €180,000. You do not pay ITP.
  • The regional government has proposed cutting that AJD to 0.4% for under-40s. It is in the 2027 draft budget, registered in the Assembly on 30 October: it does not apply yet.
  • Once the developer has its building licence, everything you pay in advance must be guaranteed by a surety insurance policy or a bank guarantee in your name and paid into a special account.
  • If handover is late, you can terminate the contract and get back what you paid with statutory interest, or grant an extension in writing.
  • In Madrid, first occupation of a new building is authorised by a responsible declaration (declaración responsable) filed with the town hall.
  • The specifications and the advertising are binding on the developer. And you do not have to take over its mortgage.
  • For defects, the law sets 1 year for finishes, 3 for habitability and 10 for the structure.

Which taxes you pay on a new build

The first sale of a new home, the one made by the developer, does not pay ITP (Impuesto sobre Transmisiones Patrimoniales, the property transfer tax on resale homes) but VAT (IVA in Spain). According to the Spanish Tax Agency, in 2026 the rate is 10% for homes, including up to two parking spaces and annexes sold with them. VAT is a national tax: the Community of Madrid cannot change it.

The 4% rate is reserved for officially protected homes (VPO) under the special regime or promoted by the public sector and sold by their developer. Not every protected home qualifies: the Community of Madrid points out that homes with public protection (VPP) and open-market homes pay 10%. Check the exact classification before you do your sums.

On top of that, the deed pays AJD (Impuesto sobre Actos Jurídicos Documentados, a regional stamp duty). In Madrid, when the buyer is an individual, the rate depends on the value of the home with its parking spaces and annexes: 0.4% up to €120,000, 0.5% between €120,000 and €180,000 and 0.75% above that. VPP homes of up to 90 m² of usable floor area that are not exempt pay 0.2%, and VPO homes are exempt. The AJD on the mortgage has been paid by the bank since 10 November 2018.

There are reliefs on the AJD amount: 10% if it is your main home and worth up to €250,000; 95% for large families buying their main home; and 100% for under-35s buying in municipalities with fewer than 2,500 inhabitants, with the same €250,000 limit.

Type of homeVATAJD on the purchase in Madrid
New open-market home up to €120,00010%0.4%
New open-market home from €120,000 to €180,00010%0.5%
New open-market home over €180,00010%0.75%
Home with public protection (VPP) over 90 m² usable10%Same as open-market
VPP up to 90 m² usable that does not meet the exemption requirements10%0.2%
Special-regime or publicly promoted VPO sold by its developer4%Exempt
Resale home or one bought from a private individualNoNo (pays ITP, generally 6%)

Sources: Spanish Tax Agency (2026 VAT rates); Community of Madrid, Taxpayer Service, AJD (23-4-2026) and “Información completa: comprar una vivienda” (29-10-2026). If you meet the requirements, the reliefs described in the text apply to the AJD amount.

An example: on a new home costing €350,000, VAT is €35,000 and AJD at 0.75% is €2,625. If the cut for under-40s is approved and you qualify, AJD would fall to €1,400. A resale home at the same price would pay €21,000 in ITP at 6%. And banks do not finance taxes: they come out of your savings, like the deposit. You will find the full breakdown in “Costs of buying a home in the Madrid region in 2026: taxes, notary, land registry and public aid”.

The AJD cut to 0.4% for under-40s: where it stands

On 5 October 2026, the Community of Madrid announced two tax cuts for under-40s: on resale homes, ITP would fall from 6% to 4% for a main home of up to €450,000; on new homes, AJD would fall from 0.75% to 0.4%. According to the official press release, the second measure would benefit around 4,200 young people, saving them €2.1 million a year, and would be included in the 2027 budget.

On Friday 30 October, the regional cabinet approved the draft budget and the Community registered it in the Assembly the same day. The official press release on the registration mentions six new tax cuts without detailing them; that day’s press lists the 0.4% AJD among them. We cover it in “Community of Madrid 2027 budget and housing: 4% transfer tax, Mi Primera Vivienda, wildfire relief and the flats bought by the Social Housing Agency. What changes if you buy or sell”. As of 31 October 2026, some things are still unknown:

  • Whether the reduced AJD will have a price cap or require the home to be your main residence. The 5 October release only sets those conditions for ITP; some press reports say they will be the same, but we must wait for the text.
  • What happens if two people buy together and only one is under 40.
  • When it will be passed. According to the press, the regional government wants the budget to apply from 1 January 2027, but until the law is published in the Official Gazette of the Community of Madrid (BOCM) and enters into force, the current rate applies.

The AJD rate is set by the date of the deed, not of the private contract. On a new build that date depends on the works being finished and the paperwork being ready. If you are under 40 and handover is expected between late 2026 and early 2027, ask the developer whether there is room for manoeuvre, but do not delay anything for a cut that has not been approved. We explain the ITP cut in “Madrid Cuts Property Transfer Tax (ITP) to 4% for Under-40s from 1 January 2027: Requirements, Savings and What Happens If You Buy in December”.

Advance payments: the guarantee the developer must give you

Usually you pay a reservation fee, sign the private contract with a further amount and keep paying instalments during construction; the rest is paid at the deed, normally with the mortgage. If the developer does not finish, you want your money back. The Building Act (Ley de Ordenación de la Edificación, LOE) protects it in its first additional provision:

  • It applies to anyone developing homes, including cooperatives and owners’ associations, from the moment they obtain the building licence.
  • The guarantee is a surety insurance policy or a joint and several bank guarantee, individual for each buyer, covering the amount paid, the taxes and statutory interest up to the expected handover date.
  • The money is paid into a special account, separate from the developer’s other funds, which can only be used for construction.
  • The contract must state that you will get back what you paid, with interest, if the works do not start, are not finished on time or do not obtain the first-occupation licence, and must identify the insurer or guarantor and the account. When you sign, you receive the guarantee document.
  • Failing to provide the guarantee can be fined up to 25% of the amounts that should have been insured.
Be careful about paying before the licence. The duty to guarantee starts with the building licence. The Community of Madrid advises checking that it exists before paying anything. If you are asked for a reservation fee before then, ask in writing how it is protected and which account it goes into.

The Bank of Spain points out that, according to the Supreme Court, the bank receiving the advance payments must require that guarantee and, if it does not, may have to answer for repaying them. The Community of Madrid also recommends obtaining an extract from the Companies Register (nota del Registro Mercantil) to assess the developer’s solvency.

First-occupation licence or responsible declaration

In the Madrid region, since the 2020 reform of the Land Act (Ley 1/2020), first occupation of newly built buildings is authorised by a responsible declaration: the developer declares to the town hall that the works comply, and the building may be occupied from the moment it is filed, without prejudice to municipal checks. Utility companies ask for it for permanent supply contracts. And under the LOE, once the licence or equivalent document exists and the home is handed over, the guarantees on your payments are cancelled. Before the deed, ask for:

  • A copy of the first-occupation responsible declaration as filed (or of the licence).
  • The certificate of completion of works.
  • Proof of the ten-year structural insurance (seguro decenal): without it, the notary will not authorise the deed declaring the new building. An instruction published in the BOE (Spain’s Official State Gazette) on 7 October 2026 clarifies that this certificate may be signed electronically.
  • The energy performance certificate and the Building Logbook (Libro del Edificio).

Delivery delays: what you can claim

The contract must set out the handover date. If the works have not started or the home is not handed over on time, the LOE lets you choose: terminate the contract and get back what you paid with statutory interest, or grant an extension in an additional clause with the new date. If you want your money back:

  1. Reread the contract: handover date, any extensions provided for and the guarantee details.
  2. Ask the developer for repayment in a verifiable way that proves the content and date, for example by burofax (a certified letter with proof of content).
  3. If you are not paid within 30 days, claim from the insurer or the guarantor bank. If you cannot claim from the developer first, go straight to them.
  4. The insurer must pay you within 30 days of your claim, and cannot refuse because the developer did not pay the premium.
  5. With a bank guarantee, do not let time pass: it lapses two years after the developer’s breach if you have not requested termination and repayment.
  6. If they do not reply within a month, the Community of Madrid says you can go to court or to the consumer affairs office.

If you would rather wait, sign the extension in writing and check that the guarantee covers your payments up to the new date. If the delay causes you other losses, such as extra months of rent, ask a lawyer whether you can claim them.

The specifications (memoria de calidades): what they are and what you can demand

The memoria de calidades describes what your home is built with: structure, façade, insulation, windows and doors, floors, kitchen, bathrooms and installations. Royal Decree 515/1989 requires the developer to make available to you, among other things, the plans of the home and its location, the usable floor area, a description of the communal areas, the layout of the installations and the materials, including thermal and acoustic insulation.

Two further rules protect you. Whatever the advertising says about construction, installations, services or payment can be demanded even if it is not in the contract: keep brochures, screenshots and emails. And when you sign, you are entitled to copies of those documents at the seller’s expense. If changes during construction alter the price, they must be notified to you and you must accept them.

  • Ask for the signed specifications as an annex to the contract.
  • Ask what open phrases such as “or similar” or “of equivalent quality” mean in practice.
  • Check that the usable floor area and the plan match what you were shown, and which parking spaces and storage rooms are included in the price.

The developer’s mortgage and taking it over (subrogación)

Developers usually finance the works with a mortgage loan that is later split between the homes. When you buy, you can take over (subrogarte) the part that corresponds to your home, or get a new mortgage wherever you like. The Bank of Spain is clear: you are not obliged to take it over. If you do, the bank has to accept you, you can negotiate the terms and it must give you the pre-contractual information (the FEIN and FiAE) at least ten calendar days before signing. It may charge a subrogation fee if one was agreed.

According to the Community of Madrid, taking over the developer’s loan does not pay AJD, and the contract cannot charge you the costs of preparing the title documents, which are for the developer. Always compare with another offer. If you are under 40 and need to borrow more than 80%, look at the regional Mi Primera Vivienda scheme: its official page makes no distinction between new and resale homes. We explain it in “Mi Primera Vivienda 2026 in Madrid: 100% Mortgages up to Age 50 on Homes up to €425,000 – Requirements, Banks and How Much You Still Need to Save”.

Housing cooperative or developer: the differences

In a development you buy from a company at an agreed price, and the business risk is theirs. In a housing cooperative you become a member of a company that builds for its members, often with a management firm: the initial price is an estimate of the cost and may change. In Madrid they are governed by Law 2/2023 on Cooperatives of the Community of Madrid.

DevelopmentCooperative
What you signPurchase contract with the developerMembership and contributions
PriceAgreed; changes that alter it must be notified and acceptedEstimated; depends on the final cost of the works
Guarantee on what you pay in advanceCompulsory from the licenceAlso compulsory
If you want to leaveWhatever the contract saysLeave as a member; repayment of your contributions is linked to another member taking your place
If there are defectsYou claim from the developer and the other partiesFrom the governing board, the management firm and the builder

Sources: Law 38/1999 on Building (BOE); Law 2/2023 on Cooperatives of the Community of Madrid, preamble (BOE, 9-6-2023); Community of Madrid, consumer affairs pages on buying a home (29-10-2026).

A cooperative can work out cheaper, but it requires more involvement and the final price is not fixed. Before joining, ask for the statutes, the contract with the management firm, the licence, the construction budget and the guarantee on your contributions.

New-home warranties: 1, 3 and 10 years

The LOE periods do not start when you get the keys but with the acceptance of the works (recepción de la obra): the act in which the builder hands the finished building over to the developer and the developer accepts it. They run from the acceptance certificate or from when any reservations made in it are remedied. Ask for that date.

PeriodWhat it coversWho is liableGuarantee
1 yearWorkmanship defects in finishesThe builderInsurance or guarantee, which can be replaced by retaining 5% of the construction cost
3 yearsDefects in building elements or installations that affect habitabilityAll parties involved in the buildingNot compulsory unless imposed by royal decree
10 yearsDamage to foundations, pillars, beams, floor slabs, load-bearing walls or other structural elementsAll parties involved in the buildingTen-year insurance, compulsory for residential buildings

Source: Law 38/1999 on Building, articles 6, 17, 18 and 19 and second additional provision (BOE). Claims are time-barred two years after the damage occurs.

Even though the 1- and 3-year insurance policies are not compulsory, the parties are still liable. The ten-year insurance protects the developer and subsequent buyers. If a defect appears, take photos, report it to the developer in writing and do not wait: you have two years to claim from when the damage occurs.

Notary, land registry and agency fees

Besides taxes, there are notary and land registry fees, set by government scales, and a gestoría (an agency that handles the paperwork) if you want one. Royal Decree 515/1989 gives you the right to choose the notary and excludes the title costs that are for the seller. This is the usual split according to the Community of Madrid:

CostWho paysGuide figure
Notary for the purchaseThe buyer, unless agreed otherwise (the bank pays for the mortgage deed)€600 to €1,000
Land Registry (registering the purchase)The buyer€400 to €700 for average-priced homes
GestoríaThe buyer, if hiredDepends on the professional
Valuation for the mortgageThe buyerDepends on the valuer
Notary, registry and gestoría for the mortgage, and AJD on the loanThe bank—
Preparing the building’s title documents (e.g. new-build declaration and division into units)The developer—

Sources: Community of Madrid, “Quiero comprarme una vivienda. ¿Qué gastos tengo que afrontar?” (24-6-2025) and “Preguntas frecuentes: compra de vivienda” (29-10-2026); Royal Decree 515/1989 (BOE). Guide figures.

What if you buy an almost-new home from a private seller?

If it is sold to you by a private individual who bought it before, you normally pay ITP and not VAT, as with any resale home: generally 6%, which the regional government proposes to cut to 4% for under-40s buying a main home of up to €450,000. The LOE warranties keep running from the acceptance of the works. Ask for the deed, the Building Logbook and the ten-year insurance details.

How we do it at Llavely

To be clear: at Llavely we sell homes owned by private individuals in the Community of Madrid, not homes from developers or cooperatives. If you buy off-plan, you sign the contract with them, and this guide will help you review it. If you are looking for a home that is already built, even a fairly new one, buying with Llavely is free: you create your buyer profile (areas, budget, type of home and how you would pay) and we invite you to the homes that suit you, with photos, a virtual tour and a fair price. Once your ID has been checked, you view the home with someone from our team and make your offer. Our specialised lawyers review the documents, work out the taxes due, draft the arras (a deposit contract) and review the deed.

If you need to sell your current home to pay for the new one, you contact us and we handle the whole sale: valuation, photos, video, floor plan and virtual tour included, and we talk to every buyer before showing it. You pay 2.5% + VAT of the price, only if you sell and on the day of signing at the notary. We do not promise timescales, but we review every home in less than 24 hours and help you organise the sale with clear dates, with the handover of your new home in mind. More in “Selling Your Home and Buying Another at the Same Time in Madrid (2026): What to Do First, Bridging Loans and Tax”.

Frequently asked questions

What taxes do you pay when buying a new home in Madrid?

If you buy from the developer, VAT and AJD. VAT is 10% (4% for special-regime or publicly promoted VPO homes sold by their developer). AJD on the deed is 0.4% up to €120,000, 0.5% up to €180,000 and 0.75% above, with reliefs in some cases. You do not pay ITP.

Does the 0.4% AJD for under-40s already apply?

No. As of 31 October 2026 it is part of the 2027 draft budget, registered in the Assembly on 30 October. It will only apply to deeds signed once the law is published in the BOCM and enters into force, with whatever requirements it sets.

Does the developer have to give me a guarantee for advance payments?

Yes. From the moment it has the building licence, it must guarantee what you pay with a surety insurance policy or an individual bank guarantee in your name, covering the amount paid, the taxes and statutory interest, and pay the money into a special account.

What happens if the developer does not hand over the home on time?

You can terminate the contract and get back what you paid with statutory interest, or grant an extension in writing. If you request repayment in a verifiable way and are not paid within 30 days, claim from the insurer or guarantor; the insurer must pay you within 30 days.

Do I have to take over the developer’s mortgage?

No. You can take it over or get a new mortgage from another bank. If you take it over, the bank must accept you and give you the FEIN at least ten calendar days before signing. According to the Community of Madrid, that subrogation does not pay AJD.

What warranty does a new home have?

From the acceptance of the works, 1 year for finishing defects (the builder is liable), 3 years for defects affecting habitability and 10 years for structural damage, with compulsory ten-year insurance. You have two years to claim from when the damage occurs.

What is the first-occupation responsible declaration?

It is the procedure by which, in the Madrid region, a new building is authorised to be occupied. The developer files it with the town hall and occupation is allowed from that moment, without prejudice to municipal checks. It is required for permanent utility contracts.

Is it better to buy through a cooperative or from a developer?

It depends on the risk you want to take. With a developer the price is agreed and the risk is theirs. In a cooperative you are a member, the price depends on the final cost and, if you leave, repayment of your contributions is linked to another member taking your place. In both cases your payments must be guaranteed.

Sources

  1. Law 38/1999, of 5 November, on Building, consolidated text (BOE, updated 15 June 2022)
  2. Instruction of 29 September 2026 of the Directorate-General for Legal Certainty and Public Faith on proving to notaries and registrars the guarantees in article 20.1 of the Building Act (BOE no. 249, 7 October 2026)
  3. Law 1/2020, of 8 October, amending Law 9/2001 on Land of the Community of Madrid (BOE no. 56, 6 March 2021)
  4. Royal Decree 515/1989, of 21 April, on consumer protection regarding the information to be provided in the sale and letting of homes (BOE)
  5. Law 2/2023, of 24 February, on Cooperatives of the Community of Madrid (BOE no. 137, 9 June 2023)
  6. 2026 VAT rates (Spanish Tax Agency)
  7. Stamp duty on documented legal acts (Community of Madrid, Taxpayer Service, updated 23 April 2026)
  8. Two new tax cuts to help under-40s buy a home, saving €116 million (Community of Madrid, press release, 5 October 2026)
  9. The Community of Madrid registers the 2027 budget in the Assembly (Community of Madrid, press release, 30 October 2026)
  10. Full information: buying a home (Community of Madrid, Consumer Affairs, updated 29 October 2026)
  11. Frequently asked questions: buying a home (Community of Madrid, Consumer Affairs, updated 29 October 2026)
  12. I want to buy a home. What costs will I face? (Community of Madrid, Consumer Affairs, 24 June 2025)
  13. Buying and selling homes (Community of Madrid, updated 8 May 2026)
  14. Mi Primera Vivienda (Community of Madrid, updated 8 September 2026)
  15. Buying off-plan: key points for understanding the developer’s loan (Bank of Spain, Bank Customer Portal, 11 September 2025)
  16. Madrid raises its 2027 budget by 7.3% and sets aside almost €20 billion for health and education (El Diario de Madrid, 30 October 2026)

Sell to people who can already buy.

Listing is free. 2.5% + VAT only if you sell, no hidden costs.